Site Clearing - 31 10 00
No description is available for this product type yet. If you are a community member, you can help build this directory by editing this entry to add your knowledge about Site Clearing.
- 31 11 00 - Clearing and Grubbing
- 31 12 00 - Selective Clearing
- 31 13 00 - Selective Tree and Shrub Removal and Trimming

- 31 14 00 - Earth Stripping and Stockpiling

Site Clearing Projects Up for Bid:
- COYOTE CREEK ELEMENTARY SCHOOL (Bids Due 2009-12-15)
- FORAN HIGH SCHOOL (Bids Due 2009-12-15)
- MNDOT CARVER CO CHASKA TRUCK STATION (Bids Due 2009-12-15)
- MISSOURI RIVER WWTP DIGESTER (Bids Due 2009-12-11)
- CALABAZAS BRANCH LIBRARY (Bids Due 2009-12-10)
Latest Articles, White Papers & Case Studies about Site Clearing:
Tips on Estimating Site Clearing Costs from RSMeans
Estimating the actual cost of performing earthwork requires careful consideration of the variables involved. This includes items such as type of soil, whether water will be encountered, dewatering, whether banks need bracing, disposal of excavated earth, and length of haul to fill or spoil sites, etc. It is very important to consider what time of year the project is scheduled for completion. bad weather can create large cost overruns from dewatering, site repair, and lost productivity from cold weather. |
Projects that Included Site Clearing:
- NJ SOUTH AMBOY TRAIN STATION-PLATFORM (South Amboy, NJ)
- Charlotte County Courthouse (Punta Gorda, FL)
- MARIE G DAVIS MIDDLE SCHOOL (Charlotte, NC)
- BASSFIELD WATER TREATMENT PLANT (Bassfield, MS)
- HARBOR SPRINGS HIGH SCHOOL PHASE 2 (Harbor Springs, MI)
- NEWPORT ESTATES MC10/MC11 PUMP STATION (West Sacramento, CA)
- KOHL'S DISTRIBUTION CENTER-STEEL (Patterson, CA)
- PRE-ENGINEERED GARAGE BUILDING(GENERAL) (Acton, MA)
- REGIONAL TRANSIT AUTHORITY FACILITY (San Luis Obispo, CA)
- SARATOGA PARKWAY LIFT STATION (Oconomowoc, WI)

