Air to Air Energy Recovery Equipment - 23 72 00
No description is available for this product type yet. If you are a community member, you can help build this directory by editing this entry to add your knowledge about Air to Air Energy Recovery Equipment.
Air to Air Energy Recovery Equipment Projects Up for Bid:
- COYOTE CREEK ELEMENTARY SCHOOL (Bids Due 2009-12-15)
- FORAN HIGH SCHOOL (Bids Due 2009-12-15)
- MISSOURI RIVER WWTP DIGESTER (Bids Due 2009-12-11)
- WHITE RIVER MARSH WILDLIFE STORAGE BLDG (Bids Due 2009-12-10)
- POLYTECHNIC HIGH SCHOOL TEA 009 BOND PKG 024 (Bids Due 2009-12-10)
Tips on Estimating Air to Air Energy Recovery Equipment Costs from RSMeans
Review all construction documentation before proceeding with the estimate for HVAC. It is not unusual to find items on the plans, but not in the specifications; or they may be in the specifications but not on the drawings. Also check any and all communications; the owner may have requested a change or expressed a concern or a specific need, and not have had it included in your drawings or specifications. |

