Common Work Results for Earthwork - 31 05 00
No description is available for this product type yet. If you are a community member, you can help build this directory by editing this entry to add your knowledge about Common Work Results for Earthwork.
- 31 05 13 - Soils for Earthwork
- 31 05 16 - Aggregates for Earthwork
- 31 05 19 - Geosynthetics for Earthwork
- 31 05 23 - Cement and Concrete for Earthwork
Common Work Results for Earthwork Projects Up for Bid:
- WSU STATE HALL FOURTH FLOOR WINDOW REPLACEMENT & ROOFING (Bids Due 2009-12-10)
- TXDOT VARIOUS ROADS (Bids Due 2009-12-09)
- BURLINGTON COUNTY COLLEGE CULINARY ARTS CENTER (Bids Due 2009-12-08)
- CENTRAL COUNTY WRF PHASE 2 (Bids Due 2009-12-02)
- PGCC CENTER FOR HEALTH STUDIES (Bids Due 2009-11-30)
Tips on Estimating Common Work Results for Earthwork Costs from RSMeans
Estimating the actual cost of performing earthwork requires careful consideration of the variables involved. This includes items such as type of soil, whether water will be encountered, dewatering, whether banks need bracing, disposal of excavated earth, and length of haul to fill or spoil sites, etc. It is very important to consider what time of year the project is scheduled for completion. bad weather can create large cost overruns from dewatering, site repair, and lost productivity from cold weather. |

