Facility Remediation Cost Estimating Tips

Mold remediators must take special considerations into account when planning the removal of mold-infested materials. Limited access to small areas such as crawl spaces can slow work down and add time and cost to a project. protective measures, including sealing off contaminated areas to avoid cross-contaminating other parts of the building, must be taken. Moldy debris may have to be packaged in vacuum-sealed plastic bags before it can be removed from the structure. These steps require additional tip, materials, and labor.

Cost Estimating Resources from RSMeans

2011 Building Construction Cost Data Book
Thousands of unit costs for building components, arranged in the new CSI MasterFormat® 2010 classification system
» Learn more
Featured Product Overview
SmartBIM Objects available for download BIM Objects
ManuSpec 3-part specs available for download MANU-SPEC 3-part Specs
SpecData datasheets available for download SPEC-DATA Datasheets
Technical Datasheets