1,600 space, 4-story hybrid Structural Steel and Prestressed Double-Tee Parking structure, with attached, double-helix entry/exit ramps. Ramps constructed with composite metal deck on structural steel. Total of 6,600 tons structural steel.
Technical Datasheets