Supports for Plaster and Gypsum Board - 09 22 00
No description is available for this product type yet. If you are a community member, you can help build this directory by editing this entry to add your knowledge about Supports for Plaster and Gypsum Board.
- 09 22 13 - Metal Furring
- 09 22 16 - Non Structural Metal Framing
- 09 22 26 - Suspension Systems
- 09 22 36 - Lath
- 09 22 39 - Veneer Plaster Base
Featured Manufacturers of Supports for Plaster and Gypsum Board:
Supports for Plaster and Gypsum Board Projects Up for Bid:
- CARL T HAYDEN VA MEDICAL CENTER BUILDING 8 (Bids Due 2010-04-14)
- GOLDSBORO COMMUNITY RECREATION CENTER (Bids Due 2010-04-13)
- CARL T HAYDEN VA MEDICAL CENTER BUILDING 1 (Bids Due 2010-04-12)
- ALAMOSA CITY COMPLEX & LIBRARY (Bids Due 2010-04-08)
- DSNY MN 1/2/5 GARAGE (Bids Due 2010-04-08)
Tips on Estimating Supports for Plaster and Gypsum Board Costs from RSMeans
A complete set of plans should contain a room finish schedule. If one is not available, it would be well worth the time and effort to put one together. A room finish schedule should contain the room number, room name (for clarity), floor materials, base materials, wainscot materials, wainscot height, wall materials (for each wall), ceiling materials, and special instructions. It is handy and easier to work out a room finish schedule on a grid system. |
Projects that Included Supports for Plaster and Gypsum Board:
- AMC THEATERS (Chula Vista, CA)
- UND STUDENT WELLNESS CENTER BID PKG 2 (Grand Forks, ND)
- CHURCH OF SAINT PETER GATHERING HALL (Delano, MN)
- THE BLUFFS (Birmingham, AL)
- AMSCOT (Kissimmee, FL)
- HUNTINGTON BEACH HIGH SCHOOL-BLDG L (Huntington Beach, CA)
- BAY MEADOWS ELEMENTARY SCHOOL (Orlando, FL)
- SANTA YNEZ COLLEGE SCH PHASE 2 BP 2-5 (Santa Ynez, CA)
- SALVATION ARMY FAMILY LEARNING CENTER (Houston, TX)
- EDUCATIONAL CULTURAL COMPLEX SKILLS CNTR (San Diego, CA)

